Abdali Boulevard Project, Pedestrian Spine – Phase II -Electro-mechanical Works

  • Category
    Buildings
    Location
    Amman, Jordan
    Engineer name
    LACECO
    Client name
    Abdali Investment & Development (Abdali SC)
    Year
    2007 - 2014

    12 separate buildings of 115,000spm approximate built-up area, 4 office buildings and 8 residential  of 4-6 typical floors each.

    4 underground parking levels of 2000 car parks capacity, including technical spaces of total built-up area of approx. 110,000 sqm.

    Retail and restaurant units at ground and mezzanine levels, commercial spaces dedicated for health clubs and restaurants at roof and top roof terraces.

    External works, including landscaping, pavement, urban furniture, external lighting, signage, planting, fountains and four major tensile structure above piazzas.

    MID Contracting Scope in this package included all Electro-mechanical works;

    • Mechanical Works: HVAC System, domestic hot and cold water system, drainage system, fire fighting system, fuel & LPG systema, BMS ( Building Management System), swimming pools and external fountains, irrigation system, FM200 system, CO2 system & steam boilers.
    • Electrical Works: power system and cables, lighting system (internal and external), telephone, TV and data systems, generators and emergency power, lightning system, earthing system, music system, fire alarm system, transformers and switch gear, main and sub-main panels, motor control centers, metering system & dimming system