DAP Production Plant

Print PageSend by email
Category: 
Industrial
Location: 
Aqaba – Jordan
Engineer name: 
SNC Lavalin NV
Client: 
Jordan Phosphate Mines
Year: 
2010

Description:

The project is an extension to the existing DAP plant, it consists of (4) separated areas namely scrubber 75, Extension 75, Scrubber 76 and Extension 76.

Scrubber 75 & 76 are mirror image they are surrounded by existing steel str. An existing equipments. Each one has an area of approximately 220m2 with 9 Piles resting on a slab, within the slab that are some equipment foundations and trenches.

Extension 75 has an area of approx. 320 m2 with 20 piles while Extension 76 has 17 piles and 3 isolated footings.