Aqaba Ferry Berth Relocation - Civil & Marine Works

Print PageSend by email
Category: 
Marine Works
Location: 
Aqaba – Jordan
Engineer name: 
Haskoning B.V. Consulting Engineers and Architects
Client: 
The Ports Corporation
Year: 
2009 - 2011

Description:

The new Ferry Berth design comprises the provision of a new floating Pontoon and a Link-span, secured to a bank-seat on new reclaimed area of shore. The floating Pontoon and the Link-span bridge will be executed in a separate Design and Build Contract by MACREGOR of Sweden / Poland.

MID Scope

  • Installation of 46No.'s offshore raking/vertical tubular piles of average length of 50 meter to 8No.'s berthing dolphins, 2No.'s restraint dolphins and 1No. Bankseat.
  • Installation of 3No.'s below water anchor tubular piles to Buoys.
  • Installation of 2,250m2 of sheet piles and associated anchor wall and tie rods.
  • 18,000m3 earthworks including 3,000m3 below water level.
  • 13,000m2 pavements, including associated kerbing, surface water drainage system and gullies, including the provision of a Class 1 bypass interceptor.
  • 750m3 reinforced concrete construction to dolphins/bank-seat-on and offshore.
  • Installation of 3 No,'s mooring buoys (Floating anchor) and anchorage system.
  • Bollards, fenders, ladders, railings and ancillary works.
  • Aluminum Catwalks between berthing dolphins.
  • Lighting to dolphins and catwalks.
  • Bathymetric survey and geotechnical bore holes for the sea bed.
  • The project included also onshore walls, access gates weigh bridge and concrete pavement slabs with a total area 2000m2 on top of reclaimed area..
Aqaba Ferry Berth Relocation - Civil & Marine Works
Aqaba Ferry Berth Relocation - Civil & Marine Works
Aqaba Ferry Berth Relocation - Civil & Marine Works
Aqaba Ferry Berth Relocation - Civil & Marine Works