Print Page Send by email

Phosphoric & Sulfuric Acid Plant

Category: 
Industrial
Location: 
Eshideyeh - Jordan
Engineer name: 
SNC-Lavalin Europe (SNCLE)
Client: 
Jordan- India Fertilizer Company (JIFCO)
Year: 
2010 - 2014

Description:

Sulfuric Acid Plant of 4500 MT/Day production capacity.

Phophoric Acid Plant of 1500 MT/Day production capacity

Neutralization Plant (Engineering & Equipment by F.L. Smidth)

MID Contrcting (Main Construction Contractor) Scope of Work:

Qatraneh Cement Plant

Category: 
Industrial
Location: 
Katraneh – Jordan
Engineer name: 
HOLTEC
Client: 
Arabian Cement Company (ACC)
Year: 
2007 - 2010

Description:

Phase I: the Construction of a Cement Plant in Katraneh near Amman with a production capacity of 5000 tons/day.

This phase incorporates all design, supply and execution of the plant’s facilities (except for the service buildings, i.e. Management Building, Oil Pumping Stations, Fire Fighting ...etc).

The Plant will be constructed from Concrete, Structural Steel, including all infrastructure works, internal roads, fences, water sewerage and water drainage.

JIFCO Storage Terminal

Category: 
Industrial
Location: 
Aqaba – Jordan
Engineer name: 
Projects & Development India Limited
Client: 
Jordan India Fertilizer Company (JIFCO)
Year: 
2012 – 2013

Construction of Storage Facility for The Phosphoric Acid that is comprised of 7 Tanks of storage capacity 45,500m3

MID Contracting Scope of Work:

  • Civil construction works
  • Erection of tanks
  • Installation of all piping works
  • Supply & installation of all electrical works
  • Supply & installation of all instrumentation works
  • Supply & apply of Painting works
  • Pre-commissioning and Commissioning.

New Phosphate Rock Terminal

Category: 
Industrial
Location: 
Jordan
Engineer name: 
Royal Haskoning
Client: 
AFCONS
Year: 
2010 - 2013

Description:

The project works include the detailed design, engineering, manufacturing, delivery on Site, construction of civil works, erection, testing, commissioning, performance testing, training of Employer’s personnel and maintenance during the Defects Liability period of the new Phosphate Rock Terminal at the South Port in Aqaba, Jordan

The Marine Works include:

Bromine and Bromine Derivatives Plant Contract 6, 9 & 16

Category: 
Industrial
Location: 
Jordan Valley - Jordan
Engineer name: 
AMEC
Client: 
Jordan Bromine Company
Year: 
2001 - 2002

Description:

  • Contract 6:
  • Foundation and Walls, Reinforced Concrete 7100 m3.

    Masonry Block Walls, 8000 m2.

    Roof, Thermal Insulated and Water Proof 140 m2.

    Concrete Protection, Celicote 163 & 167 1050 m2.

    Electrical Duct and Manholes.

    Tank Anchor Bolt, 2500 Anchor Bolt.

    Site Earthing Grid System.

    Firewater System, HDPE Pipes with Hydrants and Valves (6in to 10in).

Expansion of Evaporation Ponds Kemapco Plant Package 1

Category: 
Industrial
Location: 
Aqaba – Jordan
Engineer name: 
Dar Al-Handasah
Client: 
Kemira Arab Potash Company Ltd. (Kemapco)
Year: 
2006 - 2007

Description:

  1. Unclassified excavations
  2. Excavation to be carried out to form the pond and re-excavated material has been used in back filling of the main and secondary dykes.

  3. Lining
    • Hdpe sheets two millimeters thickness.
    • Clay liner
    • Hdpe 1.5 milemeter
    • Deo textile drain
  4. The lining was composed of four layers of different lining materials each layer of an area of 84,000 sq.m., layers are as below:

  5. Perforated Pipe dia 200mm
  6. Fence Work around the project

DAP Production Plant

Category: 
Industrial
Location: 
Aqaba – Jordan
Engineer name: 
SNC Lavalin NV
Client: 
Jordan Phosphate Mines
Year: 
2010

Description:

The project is an extension to the existing DAP plant, it consists of (4) separated areas namely scrubber 75, Extension 75, Scrubber 76 and Extension 76.

Scrubber 75 & 76 are mirror image they are surrounded by existing steel str. An existing equipments. Each one has an area of approximately 220m2 with 9 Piles resting on a slab, within the slab that are some equipment foundations and trenches.

Extension 75 has an area of approx. 320 m2 with 20 piles while Extension 76 has 17 piles and 3 isolated footings.

Qatraneh Power Plant

Category: 
Industrial
Location: 
Qatraneh – Jordan
Engineer name: 
HOLTEC
Client: 
Wartsila - Finland
Year: 
2008 - 2010

Description:

Concrete Works and installing a structural steel for the power plant including the infrastructure and internal roads, fences, sewage and storm water drains.

Union Mills for Yarn and Carpets – Sahab – Phase I & Phase II

Category: 
Industrial
Location: 
Sahab – Jordan
Engineer name: 
Jafar Toukan and Partners
Client: 
Union Mills for Yarn & Carpets
Year: 
1992 - 1994

Description:

Polypropylene Production

Line & Stores – Civil Works

Reinforced Concrete Structure located in Sahab Industrial Estate of an area 6000 m2.

  • Fair Faced Beams & Columns Spans – 10m Height – 6.0
  • Precast external facades
  • Excavation works of 25,000 m3
  • Equipment foundation and details

Tomato Paste Factory

Category: 
Industrial
Location: 
Mafraq – Jordan
Engineer name: 
Sobeh Consulting Engineers
Client: 
Shafa Food Co., a Subsidiary of Jordan Investment Corporation
Year: 
1994

Description:

Construction of seven buildings in addition to 5 industrial structures.