Upgrading of Queen Alia Airport Road Contract –A

  • Category
    Roads & Bridges
    Location
    Amman, Jordan
    Engineer name
    Consolidated Consultants
    Client name
    Ministry of Public Works & Housing
    Year
    2003 – 2004

    Upgrading a part of Queen Alia International Airport Highway of a total length 4.80 km by increasing of carriage ways to be three lanes and shoulder in each direction and replacing the middle ditch with interior shoulder and a concrete barrier.

    Scope of works included the following:

    • Construction of the storm water drainage system.
    • Increasing the length of the under passes to be suitable with the widening of the highway.
    • Relocation of lighting columns to be suitable for the new road status.
    • Making detours for the airport road, first one in a total length of 1 km from the 8th circle till Marj Al Hamam Intersection, 2nd at the Ministry of Foreign Affairs.
    • Laying new lines for :
      • Telecommunication Company (Eight Fiber Optic Cables each 2000 L.M.)
      • Electrical Company (Six 11KV + 33 KV Cables Each 2200 L.M.)
      • National Electrical Company (One 3000 L.M. KV Cable)