Category
Infrastructure
Location
Zarqa - Jordan
Client name
National Resourcing Investment & Development Corporation (NARIDEC)
Year
2002 – 2005
Stage (A)
Infra-structure works spreading over an area of 404,000 m2 of existing military camps included the following works:
- Roads of length 6500m and width up to 48.5m:
- Miscellaneous related works such as curbstone, pavement ---- etc.
- Water supply network comprising of polyethylene and ductile iron pipes including main supply and house connection total length of pipes of different diameters = 13.150 km.
- Wastewater drainage network Dia 200, 400 & 500mm.
- Retaining walls, total length 750 m, diverse heights.
- Two underpasses (pedestrian and vehicle).
- Storm water drainage network. box culvert of total length 1480 m & pipe culvert of total length 710 m.
- Main trunk, total length 7.0 km Dia 700mm.
- Telephone and electrical works.
Stage (E)
Infra-structure (which spread over an area of works 294,220 m2 of existing military camps included the following works:
- Roads of length 3313km and width up to 26,
- Storm water drainage network, pipe culvert of total length 265 m.
- Water supply network comprising of polyethylene and ductile iron pipes including main supply and house connection.
- Wastewater drainage network 2422 m.
- Miscellaneous related works such as curbstone, pavement.
- Retaining walls.
- Telephone and electrical works.